1.06.03: 170 board feet of cherry for the much anticipated stairs:
Cut to length:
Sorted, paired, jointed, ripped, and biscuited. Eighteen of the 28 risers are single pieces of cherry, the rest are 2 pieces glued together. 26 of the treads are glued up from 2 pieces, only 2 are glued up from 3 pieces.
1.11.03: lower and upper landings installed (2 1/4" side and end matched select american cherry). I milled the bull nose treads for both landings.