5.12: West lot line retaining wall:
9.21: Driveway retaining wall:
10.19: Upper driveway:
10.26: The results of two more 8 yard pours.
10.30: Although the driveway is done I still need to pour a curb to keep water from running off the outside edge (to prevent erosion).
12.10: The curb: