3.29: Peter's garage cabinets/workbench/sink:
3.29: Moved in, kinda:
12.14: I've spent the last two weeks working on the interior (in addition to working on the driveway curb). I textured and painted behind the pellet stove, drywalled and painted the master bathroom door casing, installed a cherry plywood panel under the bar, installed the kitchen crown molding, installed a toilet in the half bath, installed vanities in the half and guest baths and built cherry vanity tops for the half and guest baths.
10.12.02: More finish work by Peter.
1.11.03: Loft closet interior.