9.8: The cedar is being coved with a Cabot semi-solid (more pigment than a semi-transparent) stain. The main color is Spruce Blue. The trim is Slate Gray.
10.4: The two french doors areframed in.
10.16: The transition gable is half done.
11.10: The transition gable is done.
11.12: It takes one full day to set up the scaffolding, trim the window and corners and shingle one dormer.
11.14: The dormers are done and the scaffolding is down.
5.12: We've started on the Cultured Stone exterior.
5.24: Glenda is now in charge of the Cultured Stone exterior. It's basically a 1400 piece, 20,000# puzzle.
5.28: Waterproof covered deck/porch and cedar railing:
6.13: Glenda's progress (with help from Roberto & Karen).
8.28: The siding is done. Two sides have yet to be stained.
9.21.01: The staining is done.
10.14.02: More rock work and grouting by Glenda.